Moblie: 8613816755915
How to assemble a panelized home
Know a lot about panelized home, about the composition of panelized home kits, about the benefits of panelized home, etc. You may be confused about how to install panelized home, let us understand the installation process of Solidhome’s panelized home.
The installation sequence of panelized home is like this: bottom frame — wall panel — roof — garage.
Bottom frame assembly
- Prepare all fixed bolts, sliced ropes, and horizontal meters.
- Use M 14 bolt to install the pillar foot on the bottom frame.
- Install the pillar foot on the M 14 bolt that has been buried in the concrete basis.
- Install the M 20 bolt between the frame and the frame.
- Use horizontal measuring to ensure the foundation and pillar foot level.
- Follow the bottom frame number and install in order.
Wall panel assembly
- Install the bolt at the bottom of the wall panel.
- Wring the sleeve to the bolt.
- Slowly lift the wall plate from the hanging point of the wall panel.
- Slowly decrease the wall panel vertically until it is completely in contact with the floor frame.
- Lock bolt.
- The wall panel should be maintained perpendicular to the bottom frame to facilitate the installation of the next panel.
- Installed according to the wall panel number.
Roof assembly
- Install the cold -curved steel roof stand on the wall plate and use a special connector cargo screw.
- Install (O S B) or (M G O) roof or prefabricated fast -loading wall plates at the top of the light steel house.
- Install waterproof layer.
- Install the wire of the ceiling and the insulation layer
- Install ceiling gypsum board.
- Install the roof color steel tile at the top of the waterproof layer.
Garage assembly
- parallel hanging garage, put the pillar feet at the pillar pillar connection in turn. After installing it in turn, it drops to the ground contact.
- Finally, the houses around the house are installed.
Solidhome’s Panelized Home system is easy and quick to install. According to the assembly guide provided by Solidhome, only 5 workers are needed in the whole process, and the assembly can be completed within 24 hours. This is really a good news for homeowners who want to move in urgently, which is also a great advantage of Solidhome products.